Foundation Pit Support and Construction of Luneng Real Estate S - 20 Commercial Building
Vol 1, Issue 1, 2017, Article identifier:12-18
VIEWS - 475 (Abstract) 429 (PDF)
Abstract
With the gradual improvement of urban construction, urban construction land increasingly tense, the lack of land caused by the formation of expensive land premium. Alterations and new construction is basically plug-in embedded, the original underground, the building on the protection of the building is also increasingly diverse and complex, the construction is also increasing the difficulty. The safe use of existing facilities and the safety of construction are problems that must be addressed in urban construction.
Keywords
Full Text:
PDFReferences
Luneng Real Estate S-20 Block Slope Reinforcement Program
This reference to the Luneng Pomegranate Village Project (S-20 block) Foundation Pit Engineering Third-Party Testing Project Stage Report.
DOI: http://dx.doi.org/10.18063/scr.v1i1.274
(475 Abstract Views, 429 PDF Downloads)
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Smart Construction Research
Recent Articles | About Journal | For Author | Fees | About Whioce
Copyright © Whioce Publishing Pte Ltd. All Rights Reserved.